求大神翻译!!在线等!ok之后加悬赏!!
发布网友
发布时间:2022-04-23 12:32
我来回答
共2个回答
热心网友
时间:2023-10-13 12:26
1, the implementation of VDA6.3 layered audit, in accordance with the terms of P6 stage 26 internal implementation, with particular emphasis on team level proction process preparation work and record review, etc., enhance team leader at the grass-roots level management level, from the "doing" changed to "how to effectively and correctly doing"
2, continue to carry out the implementation of FTQ, offline FTT, AUDIT, evaluation, site quality AUDIT, repetitive activities and visit next working procere, signature, and other special activities, to improve the quality of 682, ECE and other special models of training standard and process requirements, make the KPI target.
3, continue to perform a statistical analysis in the rain test, material waste and the TOP5 waste problem rectification and external feedback, continue to analysis customer complaints of long-term VIN number change, use 4 m way of the analysis of the control on the root of the problem will be solved.
4, close, heavy moment statistics project analysis, in view of the data are collected daily, system program, arrange TOP5 in three respects: mechanical equipment, fittings and personnel statistics analysis and solve, change the previous point to point the idea to solve the problem.
5, work instruction process, to conct a comprehensive revision according to the characteristics of test for new models at the same time, the structure of the new process wi synchronization
6, quality inspection door model updating, according to the specification of WCM comprehensive update quality inspection list, quality door QA checklist and daily, weekly, monthly update IN and OUT data.
7, complete internal ISO / 9001-2008 system audit, three party audit, 3 c, GJB1573-2006 military review, ECE and WCM system audit (VDA6.3 complete internal audit), target of 0 item does not conform to the item, the implementation plan, according to the audit of non-conformance corrective actions and follow up verification.
8, finished fifth review WCM, get or keep 3 points, use HERCA find the root cause of human error, and use the incoming eight stages of control to urge supplier control.
9, pay attention to what (after-sale warning sheet), timely treatment and F100 problem and implement corrective and preventive measures are put forward.
Organization technology, team focus on project completion and efficient, not simply use measures an OPL tools such as afterwards, but carry out prevention and control, a preliminary project 6 MK, together with the engineering department at the same time do a good job in the implementation of the emergency.
10, a graded training: training technicians to implement the process interface (main never qualified disposal, rework, repair process, technology, quality instruction and temporary plan, etc.) interface training; Team leader for data statistical analysis report; Dogon training team members, and organize to surrounding factory visit training, contrast to find the gap.(有道机译)
1, the implementation of VDA6.3 layered audit, according to the P6 stage of the26 clause internal implementation, with particular emphasis on the preparationteam level pre proction and recording the process of audit, improve the grass-roots management team leader level, from "doing" changed to "how to effectivelyand correctly in doing"
2, continue to carry out the implementation of FTQ, FTT, AUDIT, offline review,on-site quality audit, repetitive activities and visit the next process, signature and other special activities, strengthen the quality standard and technology of 682,ECE and other special models of the requirements of training, make the KPIstandard.
3, continue to complete the rain test, statistical analysis and quantity of wastewaste problem of TOP5 instry to carry out rectification and external feedback,changes continue to statistical analysis of long-term customer complaints VINnumber, using 4M analysis mode will be the root of the problem on control solution.
Analysis of 4, Guan, heavy moment statistical projects, in view of the daily data collection, compilation system program, TOP5 parts and personnel arrangementfrom three aspects of statistical analysis and resolve mechanical equipment,connection, change the past, point to point the way of solving problems.
5, work instruction process characteristic comprehensive revision, the simultaneous establishment of simultaneous inspection instructions for new models, new structure process
Update 6, quality gate test mode, according to the WCM specification fully updated quality gate checklist, quality gate QA checklist and days, weeks,monthly IN and OUT data update.
7, the completion of the internal ISO/9001-2008 system audit, the three party audit, 3C, GJB1573-2006, ECE and WCM of military audit system audit (VDA6.3complete internal audit), the target is a 0 nonconformance, according to the audit proposed unqualified plan and implementation of corrective measures and track verification.
8, completed the WCM fifth review, to win or to keep 3, use HERCA to find the root causes of human error, and the use of control the incoming 8 stage to urge the supplier management.
9, pay attention to FEW (after the warning list), the timely processing of F100 problem and implement corrective and preventive measures put forward and.
The completion rate technology, attention to key project team and efficient, not only the use of ex post measures of OPL and other tools, but the implementation of prevention and control, the preliminary project 6 MK, implemented at the same time and technology together to do the emergency department.
10 grade: training, technician training to implement process interface (mainly the non conformity disposal, rework, process, technology, quality instruction and temporary plan) interface training; team leader for statistical data analysis report;multiple training team members, and organize them into the surrounding plant tour training, contrast and find the gap.(百度翻译)
热心网友
时间:2023-10-13 12:26
1, stratification of the implementation of VDA6.3 AUDIT, in accordance with the terms of P6 stage 26 internal implementation, with particular emphasis on team level of preparation before proction records and process AUDIT, etc., enhance team leader at the grass-roots level management level, from the "doing" changed to "how to effectively and correctly in do"
2, continue to carry out the implementation of FTQ, offline FTT, AUDIT, evaluation, site quality AUDIT, repetitive activities and visit next working procere, signature, and other special activities, to improve the quality of 682, ECE and other special models of training standard and process requirements, make the KPI target.
3, continue to perform a statistical analysis in the rain test, material waste and the TOP5 waste problem rectification and external feedback, continue to analysis customer complaints of long-term VIN number change, use 4 m way of the analysis of the control on the root of the problem will be solved.
4, close, heavy moment statistics project analysis, in view of the data are collected daily, system program, arrange TOP5 in three respects: mechanical equipment, fittings and personnel statistics analysis and solve, change the previous point to point the idea to solve the problem.
5, work instruction process, to conct a comprehensive revision according to the characteristics of test for new models at the same time, the structure of the new process wi synchronization of
6, quality inspection door model updating, according to the specification of WCM comprehensive update quality inspection list, quality door QA checklist and daily, weekly, monthly update IN and OUT data.
7, complete internal ISO / 9001-2008 system audit, three party audit, 3 c, GJB1573-2006 military review, ECE and WCM system audit (VDA6.3 complete internal audit), target of 0 item does not conform to the item, the implementation plan, according to the audit of non-conformance corrective actions and follow up verification.
8, finished fifth review WCM, get or keep 3 points, use HERCA find the root cause of human error, and use the incoming eight stages of control to urge supplier control.
9, pay attention to what (after-sale warning sheet), timely treatment and F100 problem and implement corrective and preventive measures are put forward. Organization technology, team focus on project completion and efficient, not simply use measures an OPL tools such as afterwards, but carry out prevention and control, a preliminary project 6 MK, together with the engineering department at the same time do a good job in the implementation of the emergency.
10, a graded training: training technicians to implement the process interface (main never qualified disposal, rework, repair process, technology, quality instruction and temporary plan, etc.) interface training; Team leader for data statistical analysis report; Dogon training team members, and organize to surrounding factory visit training, contrast to find the gap.
求英语翻译!急!在线等!可追加财富!
the main purpose I come for today is to solve the problem of package.You have any special requirement for package?Inner packing must be attractive for promotion OK, we'll pack the goods according to your requirement. Then what about shipment?as the goods is liable to be damaged...
...英语翻译,要求尽量符合的信、达、雅”或者带押韵……在线等...
Zhuhai: calendar, doumen energy-saving environmental prote
初一的几段英文,求专业人士翻译,在线等,全部翻译,谢谢!可以加悬赏
B:你能弹钢琴或拉小提琴吗?你在周末有时间吗?学校需要有人教音乐。那并不难!请打555-3721给米勒夫人。C:你在放学后忙碌吗?不忙吗?你能说英语吗?是的?那么我们需要你帮助说英语的学生。那既放松又容易!请来学生体育中心。打293-7742给布朗先生。
求日语大神翻译,在线等。急急急!
皆様の御来访は 大歓迎しております4,我去叫车,请您稍等。 私が车を连络にしますが 悄悄 お待ち下さい5,车在外面等着,我们走吧。 车が外に待ちますが 御一绪 行きましょうよ6,这次由我来接待各位。 今度 皆様の世话をさせて顶きますが7,这一点刚才已经说过了。
...我在玩SKYPE时,收到了一封英语信,请高手帮我翻译一下,在线等...
1.Skype 信用在你的最后信用购买或者用了信用的行动后 0 天期满 - 举例来说 SkypeOut 呼叫, SMS 信息。2. 每购买、呼叫或 SMS 信息重新设定对 0 天的终了时间。3. 不幸地,如果你不使用我们将会期满平衡遵从正常的商务会计规则的你的剩余信用。4. 你将会接受提醒的人以前寄 30 天、七天和 72...
初二上册22课文言文翻译,求大神帮忙,在线等。
对于菊花的喜爱,陶渊明之后就很少听说了。喜欢牡丹的人,应该很多吧!)。青苔的痕迹蔓上台阶,苍翠碧绿;绿草的颜色映入竹帘,一片青葱。山不在于高低,有了神仙就可以名声远播。水不在于深浅,有了蛟龙就显得有灵气。它的茎中空外直,不牵牵连连,不枝枝节节,香气远播,越发清幽,笔挺洁净地竖立在...
求英语翻译,急,在线等!!!
1。这是令人沮丧的访问牛津或剑桥这些天。旧的建筑物是如此奇妙宏伟,他们突出的廉价,丑陋和保存不好新的。2。然而,牛津大学和剑桥大学仍处于相对良好的状态,这主要是他们的自我融资院校结构感谢。3。但后来事实证明,这些学生发现从头学习这么难,他们辍学阿拉伯文或中文,招致来自政府的额外罚款。4。这...
求日语大神翻译,在线等。急急急!
桂林にご来访のご感想を発表していただけませんか。ご来访をお待ちしておりました。皆様のご来访を心より歓迎いたします。车をお呼びしますので、少々お待ちください。车が外にお待ちしておりますので、行きましょう。今回は、わたくしよりご案内させていただきます。この点につ...
求日语翻译 拒绝电锯 好的回答再加50分悬赏 在线等 正在翻译的跟我说...
**さんと一绪に高校时代の3年间を暮らしました。私の印象では、**さんはすごく精一杯に勉强して、いい成绩を取った上、强いチームワーク能力とリーダ能力を持っています。彼が顺调に大学课程を勉强し出来て、学校に贡献し出来ると信じています。
T^T翻译求大神快一点可追悬赏
A: 劳驾,能告诉我去鼎好大厦的路吗?B: 沿着这条路走到北四环路左转,再直走,你可以看到它在你的左手边,你不会错过的。A: 多谢!A: 劳驾,北台路在哪里?B:北台路?离这里大约有15公里,首先,你需要做718路公交车,然后在梨园站换108路就能到哪里了。A: 非常感谢!