热心网友 时间:2024-12-12 20:23

人工挖孔桩在施工中的质量控制
Quality Control in The Course of Manual Excavation Piling

学生:xxx 指导老师:xxx
Student: xxx, Faculty Adviser: XXX

摘要 Abstract

人工挖孔桩是利用人工挖孔灌注混凝土的一种桩型。这类桩由于其受力性能可靠,单桩承载力高,可直接检查桩底岩土层情况,施工操作工艺简单,无环境污染,不需大型机具设备,场地适应性强等特点被各地广泛应用在高层建筑与荷载较大的建(构)筑物中。
Manual excavation piling is a type of piling where concrete is poured into a manually bored hole. In view of its advantageous features such as reliable stress performance, high single pile bearing capacity, able to examine the condition of rock and soil layers at the pile bottom, simple operation process, environmental friendly, do not require large machinery equipments, strong site adaptability, etc., this type of piling is applied extensively all over the country in the construction of high-rise buildings, as well as buildings and structures with heavier weight load.

但人工挖孔桩因利用人力挖孔,所以劳动强度较大,单桩施工速度较慢,尤其是安全性较差。因此为保证人工挖孔桩的质量,我们需要对其施工过程进行相关控制措施的制定,不仅从施工技术方面、还要从管理方面深化质量的重要性。
However, manual excavation piling utilizes manual labor to bore holes which is highly labor intensive, and the speed of single pile driving is relatively slow, especially its poor safety. Therefore, in order to ensure the quality of manual excavation piling, we need to formulate relevant control measures for its construction process; not only in the technical aspect, but also in its management so as to reinforce the importance of quality.

人工挖孔桩质量监督的关键在于桩身工艺是否合理与地基承载力是否符合设计要求。所以应重点保证项目中桩的垂直度和孔径,应每段检查,发现偏差随时纠正,保证位置正确;以及桩底持力层应满足设计承载力要求。
本文从人工挖孔桩的施工方式入手,逐渐阐述其可能出现的质量问题;而后针对人工挖孔桩的质量检测方法进行分析,并针对可能出现的质量问题提出了相应的施工措施及管理措施。
The rationality of the pile body process and the conformity of foundation bearing capacity to the design requirements are the critical factors in the quality supervision of manual excavation piling. Thus, ring the pile hole boring in the project, it is necessary to ensure its verticality and size, to examine every section and rectify immediate if deviation is discovered, so as to ensure the accuracy of their positions and the force-bearing layer at the pile bottom fulfills the requirement of design bearing capacity.
This article begins with the description of the construction mode of manual excavation piling, and graally expounds the possibility of quality problems; then it analyzes the quality testing methods for manual excavation piling, and proposes relevant construction and management measures in respect to the possible occurrence of quality problems.

【英语牛人团】

热心网友 时间:2024-12-12 20:23

Manual hole digging pile is the use of manual holing pouring concrete for pile type. This kind of pile e to the stress of reliable performance, high bearing capacity of single pile, pile bottom can directly check of rock and soil, construction has the advantages of simple process, no environmental pollution, no large-scale machinery and equipment, strong site adaptability characteristics are widely used in high-rise buildings with greater load built (structure ) building in.

But the manual hole digging pile by using manpower digging holes, so the labor intensity is large, single construction slow, especially the poor safety. Therefore in order to ensure the quality of the manual hole digging pile, we need its construction process control measures, not only from the technical aspects, but also from the management to deepen the importance of quality.

Manual hole digging pile quality supervision is the key to pile technology is reasonable and the bearing capacity of the foundation design requirements are met. So should guarantee project of verticality of pile and pore size, every section examination, discover deviation correcting, ensure the correct position; and the pile bottom force-bearing layer shall satisfy the design requirements of bearing capacity.

This article from the manual hole digging pile construction way, graally elaborated its possible quality problems; and then for artificial hole digging pile quality detection methods are analyzed, and aiming at the possible problems and puts forward the corresponding construction measures and management measures.

热心网友 时间:2024-12-12 20:24

Artificial dig-hole pile in the construction quality control
Student: XXX guide teacher: XXX
the
Artificial dig-hole pile is using artificial dig-hole pouring concrete piles of a type. This kind of pile e to the force performance, reliable, and single pile bearing capacity is high, can direct examination pile bottom layer of rock, construction process simple, no environmental pollution, do not need large equipment, strong adaptability to the characteristics of all is widely used in high-rise building and load larger structures and buildings in the content.
But artificial dig-hole pile for using human hole, so the intensity of labor is bigger, single pile construction speed is slow, especially are less secure. So to ensure that the quality of the artificial dig-hole pile, we need to its construction process control measures related to make, not only from the construction technology, but also from the deepening the importance of quality management.
Artificial dig-hole pile quality supervision and key lies in the process of pile foundation bearing capacity is reasonable and whether meet the design requirements. So the key to ensure project of pile of vertical degree and aperture, should every check, found that at any time, ensure correct deviation position right; And pile bearing capacity of three should meet the design requirements.
This article from artificial dig-hole pile construction, graally describes the methods of possible quality problem; And then for artificial dig-hole pile quality testing method is analyzed, and the quality problem of the possible to put forward the corresponding construction measures and management measures.

热心网友 时间:2024-12-12 20:24

人工挖孔桩是利用人工挖孔灌注混凝土的一种桩型。这类桩由于其受力性能可靠,单桩承载力高,可直接检查桩底岩土层情况,施工操作工艺简单,无环境污染,不需大型机具设备,场地适应性强等特点被各地广泛应用在高层建筑与荷载较大的建(构)筑物中。

Manual hole digging pile is the use of manual holing pouring concrete for pile type. This kind of pile e to the stress of reliable performance, high bearing capacity of single pile, pile bottom can directly check of rock and soil, construction has the advantages of simple process, no environmental pollution, no large-scale machinery and equipment, strong site adaptability characteristics are widely used in high-rise buildings with greater load built (structure ) building in.

但人工挖孔桩因利用人力挖孔,所以劳动强度较大,单桩施工速度较慢,尤其是安全性较差。因此为保证人工挖孔桩的质量,我们需要对其施工过程进行相关控制措施的制定,不仅从施工技术方面、还要从管理方面深化质量的重要性。

But the manual hole digging pile by using manpower digging holes, so the labor intensity is large, single construction slow, especially the poor safety. Therefore in order to ensure the quality of the manual hole digging pile, we need its construction process control measures, not only from the technical aspects, but also from the management to deepen the importance of quality.

人工挖孔桩质量监督的关键在于桩身工艺是否合理与地基承载力是否符合设计要求。所以应重点保证项目中桩的垂直度和孔径,应每段检查,发现偏差随时纠正,保证位置正确;以及桩底持力层应满足设计承载力要求。

Manual hole digging pile quality supervision is the key to pile technology is reasonable and the bearing capacity of the foundation design requirements are met. So should guarantee project of verticality of pile and pore size, every section examination, discover deviation correcting, ensure the correct position; and the pile bottom force-bearing layer shall satisfy the design requirements of bearing capacity.

本文从人工挖孔桩的施工方式入手,逐渐阐述其可能出现的质量问题;而后针对人工挖孔桩的质量检测方法进行分析,并针对可能出现的质量问题提出了相应的施工措施及管理措施。

This article from the manual hole digging pile construction way, graally elaborated its possible quality problems; and then for artificial hole digging pile quality detection methods are analyzed, and aiming at the possible problems and puts forward the corresponding construction measures and management measures.
声明声明:本网页内容为用户发布,旨在传播知识,不代表本网认同其观点,若有侵权等问题请及时与本网联系,我们将在第一时间删除处理。E-MAIL:11247931@qq.com
...抛物线y=x2-4x+3与x轴交于A、B两点,与y轴交于点C,连AC,将直线AC向右... 抢劫罪的构成要素有哪些 抢劫罪的几个要素 抢劫罪违反了什么法律 转化型抢劫的法律认定 我想问问我的魔兽世界帐号值多少钱? 我的号能卖多少?(魔兽世界) 求评估魔兽世界账号价值,懂得来! 魔兽世界账号问题,我有一个90级的DK,想便宜出售了,直接卖了,想问问大... 魔兽世界号价值评估 及物动词的用法_“及物动词…from…”的常见用法 my plans for next year为题英语作文带翻译 为什么你总是被别人忽视? 自己在说话的时候总是被别人忽略,是因为存在感低吗? 我为什么那么容易被人忽视 前行者tk870怎么样 我想取一个英文名,狮子座的女生,s开头的,请大家帮帮我 玉米面苹果粥可以提前一晚上泡水预约吗? 玉米可以提前一晚煮好吗 从烟台到黄线,晚上7点以后还有车吗?急!!! 烟台维特风尚酒店有限公司怎么样? 双胞胎弟弟总抢哥哥玩具怎办?如何给双胞胎宝宝买玩具? 烟台哪有便宜的小旅馆啊?我和女朋友第一次去开房,而且据说白天不能开... 家有一对双胞胎,但是哥哥和弟弟经常抢玩具,怎么办? 烟台维特风尚酒店(青年路店) 烟台维特风尚酒店青年路店的详细信息 求一首中文歌 歌词第一句是i need you 很温柔 中间还有歌词是321 同学们闲时聚会 女朋友因为我没给夹菜而不高兴 该怎么办 winter holiday前面要不要加the? 彩虹岛 显卡问题? 吃麻辣烫还是去优衣库啥意思? 素心最爱的是谁 天下第一素心被谁弄出来的 癌症和艾滋病相对来说哪种病比较难治? 艾滋病PK癌症,谁更难治? 艾滋病和癌症,哪个更难治 艾滋病和癌症,谁的死亡率高?什么时候可以克服癌症? 孕14周会羊水早破吗 孕14周流羊水了,内裤上手掌那么大,做b超显示羊水深度2.2cm能保住吗_百... 胎膜早破后来不流羊水了怎么办 舞法舞天攻略大全舞法舞天推图、关卡及大妈攻略 2023年五一劳动节周日补周几的班 康瑞保外包装上有丹麦字样吗? 我母亲去年老是心烦和闹心,上医院大夫给开的丹麦药,... 丹麦药学授课型硕士网申要求 have的中文翻译 奥特曼格斗进化重生3下载了解压包怎么才能玩? not和have连读是什么 谁是世界漫画销量史上最多的? 我家的奥特曼格斗进化重生解压存档是总是文件格式毛病怎样回事。_百 ...