发布网友 发布时间:2022-04-24 06:24
共4个回答
热心网友 时间:2022-06-16 19:08
This proct started to volume proction after qualified initial inspection. During the volume proction, PQC found that there was defect in the dimension 5.15-0.03, and separated the defective procts. QC 100% sorted the defective procts, but still has a few non-conforming procts mixed in e to unclear specification. Meanwhile, FQC did not found out in time.
热心网友 时间:2022-06-16 19:09
Readjusting to the cutters and start the mass proction after confirming the size .
Trainning and ecating the selection workers to improve their responbility , and avoid the poor quality remained after selection .
No badness found after readjustment of the cutters.
The problems happened before were marked on the operation instruction to mention the manufacturer to avoide the same problems
Operators self-check refer to the operation instruction, report the problems when it found in time
OQC(outgoing quality control) should make the verfication refer to the inspection specification , improve the problem when it found in time .
热心网友 时间:2022-06-16 19:09
你可以用有道人工翻译热心网友 时间:2022-06-16 19:10
百度翻译器 你用一下追问我不要翻译器翻译的