1, be responsible for program before the start of proction preparations, including raw materials using the optimized, outsourcing factory technical audit and determine, standard parts purchasing application, part of the design of non-standard transformation, project design jigs and fixtures.
2, project proction schele control, outsourcing parts schele control, outsourcing proction process quality supervision and audit, workshop proction schele control, coordination, on-site problem solving, guarantee the project schele of delivery.
3, project delivery preparations, including completion data, proct packaging design, shipping address, contact persons and batch confirmation.
4, assist the proction manager in the shop on-site proction management, including proction continuous improvement, 5S management.
5, responsible members of the project team work allocation, steering group member's work, for team member eu-funded project management.
6, responsible for the company's welding procere qualification, welding quality management.
Second,
1 responsible for new district of steel coils transit equipment proction engineering: XiMaKe drawings design, drawing proction processing with drawings, non-standard proct design drawing, some parts localization, BOM list compiled maintenance, and XiMaKe design personnel technical exchanges, Germany ECN translation execution and completion of the data sorting, responsible for solving proction technical problems.
2. Responsible for 1420mm cold rolling mill/silicon steel engineering, mitsubishi drawings design, non-standard design, completion data sorting, responsible for solving proction technical problems.
3. Company equipment management, familiar with fixed assets accounting management, spare parts management, participation with requisitions equipment overhaul plan.
4 for marketing, purchasing, outsourcing departments provide proct technical support.
热心网友
时间:2024-11-02 10:08
我曰,你这全部专用词语,我中文都看不懂咋帮你翻?
热心网友
时间:2024-11-02 10:09
1, before the start of proction responsible for project preparation work, including the use of raw materials optimization, the Association's technical review and determine the factory standard parts procurement applications, some non-standard parts of the design into the project fixture design.
2, the project proction schele control, the Association of schele control, the Association of Quality Supervision and audit the proction process, the workshop proction schele control, coordination, on-site problem solving, ensure that the project delivery schele.
3, preparation of project delivery, including the completion of the information, procts, packaging design, shipping address, contact person, batch confirmation.
4, to assist the proction manager on the shop floor proction management, including the proction of continuous improvement, 5S management.
5, responsible for project team members work assignments, the Steering Group members work on the overall management of project team members.
6, responsible for welding procere, welding quality control work.
Second,
1. Is responsible for New Line Transport equipment manufacturing project Coil: SMS drawings into design, drawing proction and processing with drawings, non-standard proct design, drawing, some parts made, BOM Table for maintenance, and the SMS design personnel and technological exchanges, German translation of the implementation of ECN, completed documentation, the scene made responsible for solving technical problems.
2. Responsible for the 1420mm cold rolling mill / silicon steel project, Mitsubishi drawings into the design, non-standard design, completion of documentation, is responsible for solving technical problems on-site proction.
3. Company equipment management, familiar with the fixed assets, account management, parts requisition and management, participate in equipment overhaul planning.
4. For the marketing, purchasing, outsourcing and other departments to provide proct support.