The two sides on the public site maintenance,8# fan, field personnel and other issues, through consultation, agree as follows:
Public sub1on wind field in low voltage side of insurance frequently damaged ( fault code 5216) Division I spare parts are clearance, clearance to begin immediately after completing the scene replacement parts, plans in May10recently completed public wind all fans of such replacement parts.
2fan PLC communication fault, leaf position measurement error, the generator speed is out of range, Division I has a clear question, through the replacement procedure and spare parts and other measures have been basically resolved, for the above-mentioned problems, I Division will continue to pay close attention to, so as to avoid the recurrence of.
3yaw sensor wiring error warning I would be followed by communication between staff, identify problems promptly after solution.
4 on the low wind power curve optimization problem, our meeting with Spain Engineering Department to confirm whether there is room for improvement, and confirm the public whether the fan with turbulence power compensation system.
5 on the transformer arrester choice I confirm transformer rated voltage of an arrester is 42KV, continuous operating voltage is 33kV, with60099-4GB11032requirements.
6 on the monitoring system of air blower of partial words translation is not accurate, I Division will collect the specific problem.
7 monitoring system and remote control system of plane directly drawing power curve and fan power curve is derived when the instantaneous wind speed and instantaneous power without cloth, I will be the secretary with the technical departments.
8 on the public site personnel on duty, after our service department for timely communication with the owners, to discuss the matter. In principle remain on-site management personnel and technical personnel stability.
The 9sides after discussion of recognized public sub8# accident was due to a lightning strike. In order to reduce the risk caused by lightning thunderstorm season, owners have tested every bit of grounding resistance, test results are qualified. The owners are boosting station, fan protection parameter exchange. Lightning protection system for Wind Field Division I will contact the owners according to the practical situation to arrange special person for lightning protection system of fan blades, the grounding system to conduct a comprehensive inspection, eliminate hidden dangers.
热心网友
时间:2024-03-15 09:51
The two sides on the public site maintenance,8# fan, field personnel and other issues, through consultation, agree as follows:
Public sub1on wind field in low voltage side of insurance frequently damaged ( fault code 5216) Division I spare parts are clearance, clearance to begin immediately after completing the scene replacement parts, plans in May10recently completed public wind all fans of such replacement parts.
2fan PLC communication fault, leaf position measurement error, the generator speed is out of range, Division I has a clear question, through the replacement procedure and spare parts and other measures have been basically resolved, for the above-mentioned problems, I Division will continue to pay close attention to, so as to avoid the recurrence of.
3yaw sensor wiring error warning I would be followed by communication between staff, identify problems promptly after solution.
4 on the low wind power curve optimization problem, our meeting with Spain Engineering Department to confirm whether there is room for improvement, and confirm the public whether the fan with turbulence power compensation system.
5 on the transformer arrester choice I confirm transformer rated voltage of an arrester is 42KV, continuous operating voltage is 33kV, with60099-4GB11032requirements.
6 on the monitoring system of air blower of partial words translation is not accurate, I Division will collect the specific problem.
7 monitoring system and remote control system of plane directly drawing power curve and fan power curve is derived when the instantaneous wind speed and instantaneous power without cloth, I will be the secretary with the technical departments.
8 on the public site personnel on duty, after our service department for timely communication with the owners, to discuss the matter. In principle remain on-site management personnel and technical personnel stability.
The 9sides after discussion of recognized public sub8# accident was due to a lightning strike. In order to reduce the risk caused by lightning thunderstorm season, owners have tested every bit of grounding resistance, test results are qualified. The owners are boosting station, fan protection parameter exchange. Lightning protection system for Wind Field Division I will contact the owners according to the practical situation to arrange special person for lightning protection system of fan blades, the grounding system to conduct a comprehensive inspection, eliminate hidden dangers.
Both sides sign.